SHENGHAO RECYCLING EQUIPMENT
Manufacturing
Eight steps, seven documents
At every step you receive something you can check — not a promise that something will be confirmed later.
| # | Step | What happens | What you receive |
|---|---|---|---|
| 1 | Brief | Material type, dimensions, daily volume, power supply, site layout, destination | A written summary of your requirements to confirm |
| 2 | Selection | We compare two or three configurations against your material and output | A one to two page selection note, and why the alternatives do not fit |
| 3 | Quote | Line-item pricing, with the factory named for each item | A quote you can compare line by line, options priced separately |
| 4 | Order | Contract, deposit, production slot | Signed contract, proforma invoice, production schedule |
| 5 | Inspection | Test run, key dimensions, nameplate, hydraulic pressure | Photo and video inspection report before the balance is due |
| 6 | Packing and loading | Seaworthy packing, loading plan, container photos | Packing list, loading photos, container number |
| 7 | Documents | Invoice, packing list, bill of lading, certificate of origin, CE where applicable | A document pack your customs broker can use without questions |
| 8 | After delivery | Spare parts, warranty coordination, technical questions | A named contact and a response time |
The seven deliverables
- Selection note
- Line-item quote
- Scope-of-supply table
- Inspection report
- Loading plan
- Document pack
- Spare parts list with prices
How payment is structured
30% deposit to schedule production; 70% before loading, after the inspection report is approved. The balance moves only when the inspection report does — you see the machine before the money does.
What we do not do
- We do not quote a price before we know the material and the destination.
- We do not list a warranty we cannot get the factory to honour.
- We do not put your deposit down before the configuration is confirmed in writing.
YOUR NEXT PROJECT
Let’s put the right machine to work.
Tell us your material, required output and destination. We’ll discuss a suitable configuration with you.